"Open your portfolio" is where an architecture interview tends to begin, and half of it is decided there. The interviewer is less interested in how good the renders look than in what problem the design solved, why the plan is the way it is, and whether you drew the details yourself.

Then come the questions talent does not answer: escape routes, the external wall section, coordination with structure and services, and what you do when the client wants the cost down after the design is signed off. This page is for architects in design practices and consultancies, and for those on the site-supervision side.

Portrait of AI coach Maya
Interview Prep · free first questionMaya · AI interview coach · international English

Try the first architect interview question free with AI coach Maya

Hear AI coach Maya ask it
Question 1 of your interview · The technical sit-down

What are the stages of design, and what comes out of each?

No card · the full interview is ⁦$10⁩, once

Take the whole set with you

All 20 questions as a PDF you can take into the interview. Free account.

Generated from this page. Nothing on this page is hidden from you — the account is for the file.

The phone screen

A recruiter filtering, not evaluating. Answer these quickly and get to the part that decides.

The portfolio

All levels

The common mistake is turning pages and describing what the interviewer can already see.

  1. Take us through a project in your portfolioShow the answer guide

    One or two projects, not ten. Start with the problem — the site's constraints, the brief, the idea that resolved the conflict between them — then plan and section, then the detail you are proudest of. Be explicit about your role.

    Experienced candidates should show something built, and what changed between design and construction, and why.

    One candidate's version

    This is my final-year project: a community centre on a tight plot with two street frontages. Public and service entrances ended up on the same face, so I dropped the services below the back-street level and used the change in level. This section shows it. The elevations were my weakest part; I'd simplify them now.

    Problem first, the move shown in a section, and an honest weak point.

    What to avoid

    "Here's the plan, here's the elevation, here's the 3D." Describing what they can see wastes your time and says nothing about how you think.

  2. Why do you want to work at this practice?Show the answer guide

    Name a project of theirs you have actually looked at and one specific thing in it — a façade move, a response to climate, the type of work — and connect it to what you want to learn or add. If the practice is more commercial than design-led, "I want to learn how design becomes drawings that get built" is an answer a director respects.

  3. What's the weakest project in your portfolio, and why is it there?Show the answer guide

    Not "they're all strong". Name what didn't work — massing, circulation, the façade — what you'd change now, and why you kept it: it shows a skill or a stage where you learned something. An architect who sees the faults in old work has moved on from it.

The technical sit-down

Where it stops being about your CV. You either know these or you don't — and bluffing fails on the follow-up.

Design stages and the client

Entry – mid

How a client's request becomes a building, in stages with defined outputs.

  1. What are the stages of design, and what comes out of each?Show the answer guide

    Names vary, so pick one framework and know it. The RIBA Plan of Work 2020 has eight stages: 0 Strategic Definition, 1 Preparation and Briefing, 2 Concept Design, 3 Spatial Coordination, 4 Technical Design, 5 Manufacturing and Construction, 6 Handover, 7 Use. Other offices say concept, schematic, design development and construction documents.

    Then what matters: what is issued at the end of each stage and who signs it off. A change at concept costs paper; at technical design it costs weeks; on site it costs demolition.

  2. How do you turn a brief into a schedule of accommodation?Show the answer guide

    Questions before drawing: who uses the building, how many, what activities, what must be adjacent and what separated. Then a schedule of spaces and areas, an adjacency diagram, and a check of the total against what planning allows on the plot. Add an allowance for circulation, walls and plant over the net areas — the candidate who sums the rooms and calls it the gross area is surprised by the first plan.

  3. How do you design for a hot climate?Show the answer guide

    Reduce the cooling load before sizing the plant: orientation with long façades away from low east and west sun; horizontal shading where the sun is high and vertical or adjustable where it is low; glazing ratio and glass performance; insulation and thermal bridging; courtyards and thermal mass where they suit. Tell the mechanical engineer early, because these decisions change his loads. If asked about rating systems, name only those you have actually worked under.

  4. The client changes their mind after sign-offShow the answer guide

    Find out why — sometimes the request is a solution to a different problem a smaller change can fix. Then set out the impact in writing: time, cost, other disciplines, and fees if it is outside scope. No significant change goes ahead without written agreement to its impact.

Codes, details and coordination

Entry – mid

Nobody expects code numbers from memory. They expect you to know which code governs, where the number lives, and how it moves the plan.

  1. How do you design escape routes?Show the answer guide

    Start with the code the project adopts — a local code, NFPA 101, the IBC — because its numbers govern. Then the concepts: number of exits by occupancy and occupant load; travel distance to the nearest exit and common path before two routes exist; exit and stair widths by the number using them; protected stairs with fire-resisting construction and self-closing doors; avoiding long dead ends.

    Then the line that shows experience: review the plan against the fire code, or with the fire consultant, before freezing the design, because moving a stair afterwards moves the building.

    What to avoid

    "Maximum travel distance is so many metres." One number from memory differs between codes, occupancies and sprinklered buildings. Name the code, not the number.

  2. Draw me a section through an external wall and roofShow the answer guide

    Wall: structure or blockwork, insulation, a vapour control layer on the correct side for the climate, external finish, and thermal bridges at beams and columns dealt with. Roof: slab, screed to falls, waterproofing, insulation (in an order that differs between warm and inverted roofs), protection. At the junction: how the waterproofing turns up the parapet, where it stops and how it is protected.

    Water gets in at junctions, openings and outlets, not in the middle of the roof. Draw the parapet detail with care and the interviewer will notice.

  3. How do you coordinate with structure and MEP?Show the answer guide

    With dates, not intentions: fix the structural grid early, reserve risers and plant rooms before they are filled, agree ceiling zones with what runs above them, and run regular clash checks on combined drawings or a federated model. Floor-to-floor height is built up from the bottom, layer by layer — the architect who draws a 3 m ceiling and discovers the duct and beam need more than the storey is not unusual.

  4. What do you check on a façade shop drawing?Show the answer guide

    Setting out against the design, fixings to the structure, movement joints, internal drainage, thermal and acoustic glass performance against the specification, and fire-stopping at slab edges. Then the sample and mock-up: approve performance and appearance together, not just the colour.

Software and the design test

Entry – mid

Graduates are asked about software more than anyone, and may be set a test.

  1. How good is your Revit?Show the answer guide

    Not "excellent". Say what you have done: a full model through to sheets, families you built, worksharing on a central model, schedules of doors and finishes from the model. Expect a follow-up — system versus loadable families, or working with a linked structural model.

  2. The design test: what are they marking?Show the answer guide

    Three versions of the same test: "plan this in two hours", "turn this sketch into a drawing", and "adapt this plan to a new brief".

    Timed plan: organisation — circulation, entrances, adjacencies, services — before beauty; grid and blocks first, detail last. Sketch to drawing: keep the idea, fix what can't be built, and point out what you changed. Adaptation: respect what exists — structure, risers — rather than starting again. In all three, hand in on time with a note of what is unfinished.

Site and scenarios

Mid – senior

Mostly about the moment design meets reality: budget, code or contractor.

  1. The contractor raises an RFI saying your detail can't be builtShow the answer guide

    Understand before defending: read it, visit if you can, and ask whether the detail is wrong or the conditions changed. Then answer quickly with something buildable — a slow architect makes the contractor solve it himself, rarely in a way you like.

  2. The client wants the cost down after the design is completeShow the answer guide

    Value engineering — and the traps are agreeing to trim everything a little, or refusing to engage. Ask the QS where the cost sits by element. Look for alternatives that keep the idea: another finish with the same performance, a simplified repeated detail, fewer window types. Leave what gives the building its identity until last.

    Present options with figures and consequences, not a deletion list. The decision is the client's; the information is yours.

  3. Tell me about a design that was heavily criticisedShow the answer guide

    Criticism is daily in architecture. The interviewer wants to know what you do with it.

    Weak answer

    At my final review they criticised the elevations, but I was convinced the idea was right and the jury didn't get it.

    Nothing learned, and blame placed elsewhere. The practice will expect the same about clients.

    Strong answer

    In an internal review the project lead said my plan had needlessly long corridors. Honestly, I was annoyed — then I measured: circulation was about a quarter of the area. I reorganised around the service core and the corridors shortened a lot. Since then I check the circulation ratio on every plan before I present it.

    Admits the reaction, tests the criticism with a number, changes the design and the habit.

    Only tell a criticism story that ends with something you now do and didn't before.

  4. The client asks for something that breaks the regulationsShow the answer guide

    Say so clearly, with the reference, then find the need behind the request and propose a compliant way to meet it. If the client insists, put your position in writing: your name on the drawing is your professional responsibility, and "the client asked" does not transfer it.

  5. Three projects, one deadlineShow the answer guide

    Whatever blocks other people first — the drawings structure, services or the contractor are waiting on — then contractual deadlines, then the rest. Tell your manager early if time won't stretch, with a proposal for what can safely go out incomplete.

The closing conversation

The part most candidates waste. What you ask here is read as carefully as what you answered.

Questions to ask them

  • What kind of projects would I be on in the first six months?
  • Is the office fully on Revit, or still partly on AutoCAD?
  • Would I be involved in site supervision, or design only?
  • How are drawings checked before they leave the office?

The checking question tells them you know a drawing leaving the office is a responsibility, not a picture.

The two pages every job shares

This guide covers your field. These two cover the frame the questions are built on — the behavioural canon, and the screening call that decides who reaches an interview at all.

  • Behavioral interview questionsThe canon every profession shares: error, conflict, pressure, initiative, and where your limits are.www.atshiring.com/en/interview-questions/behavioral
  • Screening and first-round questionsThe recruiter call: introductions, the administrative gate, and where people lose money on salary.www.atshiring.com/en/interview-questions/screening

Ordering note

The order reflects our judgement of how these interviews usually run — portfolio, design stages, technical, software, site and scenarios. We found no source measuring question frequency for this role, so we claim none.

Sources

Everything consulted for this page, named in plain text.

  • RIBA — Plan of Work 2020 Overview (PDF)
  • NFPA — NFPA 101 Code Development