Electrical Engineer Interview Questions
In a building-services electrical interview, someone will sketch a distribution board and ask which cable you would run to a load sixty metres away. They are not checking whether you remember a table. They are listening for the sequence — design current, protective device, corrected capacity, voltage drop, fault withstand — and for the moment you notice which of those actually governs.
This page is for electrical engineers on buildings and construction projects, in design offices and on site. It is not for power generation or transmission roles. The mechanical engineer page on this site covers pumps, HVAC loads and plant; this one covers power, protection, testing and the electrical side of coordination.

Try the first electrical engineer interview question free with AI coach Maya
How do you size a cable?
No card · the full interview is $10, once
Take the whole set with you
All 20 questions as a PDF you can take into the interview. Free account.
Generated from this page. Nothing on this page is hidden from you — the account is for the file.
Start here — the five most asked
In the order the sources put them. If you only have twenty minutes, spend them on these.
The phone screen
A recruiter filtering, not evaluating. Answer these quickly and get to the part that decides.
These two pages teach the frame. This page gives you the version that fits your field — read them together.
Where you have spent your time
All levels
Design and site engineers get different follow-ups, so the first questions find out which you are.
Walk me through the last project you worked onShow the answer guide
Pick one system you were genuinely responsible for and follow it through: from load or drawing, to procurement and installation, to testing and handover. Give scale in terms that mean something — floors, transformer rating, number of boards — and then your exact part in it.
One candidate's version
An eight-storey office block. I had small power and lighting on floors three to six, supervised the subcontractor's cable pulling from the sub-boards, witnessed insulation resistance tests on my floors and wrote up the results for the consultant.
The boundaries of responsibility are clear. Do the same with yours.
What to avoid
"I did everything — power, lighting, low current, fire alarm, generator." A long list with no depth invites a test on every item.
Design or site — which do you prefer?Show the answer guide
Say honestly, then credit the other side. A designer who has never watched cable pulled through a congested containment route draws routes that cannot be built; a site engineer who does not follow the design calculation swaps a cable size because it is in stock without knowing what that breaks.
The technical sit-down
Where it stops being about your CV. You either know these or you don't — and bluffing fails on the follow-up.
Design calculations
Entry – mid
Answered by sequence and by naming the standard the project uses — IEC 60364, NFPA 70 (the NEC), or a local code that refers to one of them.
How do you size a cable?Show the answer guide
Design current from the load. A protective device rated at or above it. Tabulated capacity for the installation method, corrected for ambient temperature, grouping and thermal insulation, so that the corrected capacity is not below the device rating. Voltage drop over the route against the specification's limit. Then fault withstand, so the device clears a short circuit before the insulation is damaged.
Add that on long runs voltage drop usually governs, so the cable goes up a size even though it is thermally adequate — and that you recheck the device still protects the bigger cable.
What is discrimination (selectivity), and how do you achieve it?Show the answer guide
Only the device nearest the fault trips; the upstream one stays closed. Without it, a fault on one lighting circuit can black out a floor. You check it by comparing time-current curves across the range of prospective fault currents, or by using the manufacturer's selectivity tables for that combination, and by setting time delays on larger breakers. It matters most on life-safety supplies such as fire pumps.
Icu or Ics?Show the answer guide
Under IEC 60947-2, Icu is the ultimate breaking capacity — the highest fault current the breaker can interrupt, after which it may not be fit for further service — and it must be at least the prospective short-circuit current where the breaker is installed. Ics is the service breaking capacity, stated as a percentage of Icu (25, 50, 75 or 100%): the highest fault it can interrupt and stay in service. How high an Ics you need depends on how much continuity of supply matters at that point.
Explain TN-S, TN-C-S and TT earthingShow the answer guide
TN-S: separate neutral and protective conductors all the way from the source. TN-C-S: a combined PEN conductor from the supply, split into separate neutral and protective conductors at the installation and never recombined. TT: the installation has its own earth electrode independent of the supply earth, and because the fault loop impedance is relatively high it relies on RCDs to disconnect. Who chooses the system is the supply authority and the specification, not the contractor's engineer.
What does an RCD do that a circuit breaker doesn't?Show the answer guide
It compares current out on the line with current back on the neutral and trips when some of it leaks to earth, for example through a person. A breaker protects the cable from overload and short circuit; it does not protect a person from a small earth-leakage current. Additional protection for socket circuits is typically by 30 mA RCDs under IEC 60364, and grouping too many circuits on one RCD causes nuisance tripping — so distribution is part of the design.
How do you size a standby generator and its ATS?Show the answer guide
Start with what must run on loss of mains — life-safety loads first, then what the client wants on top — apply demand factors, and check motor starting, which can govern the rating more than running load. Size the ATS on the board it feeds, and decide its pole count from the earthing arrangement, because whether the neutral is switched is the question that shows you have actually installed one.
Fire alarm, submittals and coordination
Entry – mid
Systems that carry little power and a great deal of responsibility, and the paperwork around them.
Conventional or addressable fire alarm — what's the difference?Show the answer guide
Conventional systems report by zone; addressable systems identify each device and monitor its status. The site consequence: an addressable system has to be programmed with every address in the right location, and a wrong entry sends the response to the wrong room. Design and installation follow the standard the project names, such as NFPA 72 or its equivalent.
What do you check on a distribution board submittal?Show the answer guide
Three questions in one: "What do you check on a board submittal?", "How do you know the breakers can take the fault level?" and "What goes wrong at delivery?"
Content: breaker ratings and numbers against the load schedule; IP rating for the location; busbar rating; cable entries. Fault level: breaking capacity against the calculated prospective fault current at that board, not at the main switchboard. Delivery: the board's dimensions against its room and against every door and corridor on the way there — the approved board that will not fit through the plant room door is a classic.
Testing, commissioning and safe working
Entry – mid
Initial verification has its own standard — IEC 60364-6, for example — and the specification says what your project requires.
What tests come before you energise an installation for the first time, and in what order?Show the answer guide
Inspection first, with the installation isolated. Then dead tests: continuity of protective conductors, insulation resistance, polarity. Only then live tests: earth fault loop impedance, to show the device will disconnect in time, and RCD operation, followed by functional checks.
The order is the answer: you do not put voltage on a circuit until you have shown its insulation is sound and its protective path is continuous. Acceptance values come from the standard and the specification, not from memory.
Insulation resistance reads low. What do you do?Show the answer guide
Do not energise. Disconnect connected equipment, which may be causing the reading, and split the circuit until you find the fault — moisture in a joint box, a cable nicked during pulling, a fixing through a ceiling. Retest after repair and record both readings.
How do you work safely on a board that might be live?Show the answer guide
Permit, isolate, lock off and tag with your own lock, then prove dead with an approved tester — and prove the tester on a known source before and after. A faulty tester reads zero on a live board.
Scenarios
Mid – senior
The interviewer wants someone who makes it safe first and finds the cause second.
The main incomer trips on first energisationShow the answer guide
Which protection operated — overload, short circuit or earth fault? That narrows the search at once. Then energise in stages: all outgoing ways off, incomer alone, then each way in turn until it trips again. For earth-fault trips, look for a neutral-earth connection in a sub-board — and once found, check every other sub-board before energising it.
The board delivered doesn't match the approved submittalShow the answer guide
Do not install it 'temporarily'. Photograph the rating plate, compare with the approval, report in writing, and let the decision be return or a formal re-submission if it is equal or better. Removing it after termination costs more than a week's wait.
Tell me about a design mistake you caught before it reached siteShow the answer guide
In electrical work a mistake can be a hazard, so the interviewer wants to hear that you caught it before it hurt anyone and that you reported it.
Weak answer
I forgot to update a load schedule once, but I noticed quickly and fixed it.
No consequence, no way it was caught, nothing changed afterwards.
Strong answer
When a floor's use changed I added kitchen loads but didn't update the sub-board schedule. A colleague spotted at shop-drawing review that the incomer was now undersized. I told my manager before the board was ordered, we upsized the incomer and the submain, and since then every change of use opens a line in the change log and the schedule is updated before the drawing.
A real error, caught before procurement, reported, and a new habit that prevents a repeat.
A mistake story should end with what changed in how you work, not only with the fix.
The client is pushing to energise before testing is completeShow the answer guide
No — but offer a path: test and energise the circuits the client needs first, keep the rest isolated until tested. A safe partial solution persuades more than a flat refusal, and an incident would cost far more time than it saves.
IEC or NEC — which have you worked to?Show the answer guide
Say which, honestly, and name a difference you met in practice: terminology (earthing versus grounding), how ampacity tables are organised, and conductor sizes in square millimetres versus AWG and kcmil. The specification decides which applies; never mix the two in one calculation.
The closing conversation
The part most candidates waste. What you ask here is read as carefully as what you answered.
Questions to ask them
- Is this role design, delivery, or both?
- Which standard do your projects work to — IEC or NEC?
- Who carries out testing and commissioning — your team or a specialist?
- What stage is the project I'd join at now?
The two pages every job shares
This guide covers your field. These two cover the frame the questions are built on — the behavioural canon, and the screening call that decides who reaches an interview at all.
- Behavioral interview questionsThe canon every profession shares: error, conflict, pressure, initiative, and where your limits are.www.atshiring.com/en/interview-questions/behavioral
- Screening and first-round questionsThe recruiter call: introductions, the administrative gate, and where people lose money on salary.www.atshiring.com/en/interview-questions/screening
Before the interview
Ordering note
The order reflects our judgement of how these interviews usually run — experience, design, coordination, testing, scenarios. We found no source measuring question frequency for this role, so we claim none.